Solar power plant · Contra Costa, CA

P66 Rodeo Solar

P66 Rodeo Solar is a 30 MW solar power plant in Contra Costa County, California, operated by P66 Rodeo Solar. Its oldest generator still running came online in 2023. In 2025 it generated 37 GWh, about what 6,200 average California homes use in a year.

Capacity30 MWNameplate, September 2026
Generated37 GWhIn 2025
Capacity factor14%Share of the most it could make, 2025
Generators1Oldest from 2023

P66 Rodeo Solar in context

Among the 967 solar plants in California in the EIA's inventory, it is the 151st largest, about 0.1% of the state's 32 GW of solar capacity.

Contra Costa County has 40 power plants of 1 MW or more with 4.2 GW in all; P66 Rodeo Solar is 1% of that and the largest of 21 solar plants there.

Its capacity factor of 14% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Contra Costa County goes 4.6 hours a year without power, the 40th most of 56 counties in California. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

P66 Rodeo Solar (outlined) and other plants in Contra Costa County, shaded. 38.035, -122.247.

Plant facts

Operator
P66 Rodeo Solar
Sector
IPP Non-CHP
Grid operator
CISO
County
Contra Costa County, CA
EIA plant ID
68890
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
P66RS Solar Photovoltaic 30 MW 2023 –

Questions

P66 Rodeo Solar, answered

How much power does P66 Rodeo Solar produce?

P66 Rodeo Solar has 30 MW of capacity from one generator. In 2025 it generated 37 GWh, 14% of the most it could have made running flat out all year (its capacity factor).

How many homes does P66 Rodeo Solar power?

Its 2025 output of 37 GWh equals the yearly electricity use of about 6,200 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is P66 Rodeo Solar?

P66 Rodeo Solar is in Contra Costa County, California, at about 38.035°, -122.247°. It is one of 40 power plants of 1 MW or more in the county. The average electricity customer in Contra Costa County goes 4.6 hours a year without power, the 40th most of 56 counties in California. The county's page has the full outage record.

Who operates P66 Rodeo Solar?

It is operated by P66 Rodeo Solar (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did P66 Rodeo Solar open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.