Storage power plant · Riverside, CA

Hecate Energy Desert Storage 1 LLC

Hecate Energy Desert Storage 1 LLC is a 10 MW storage power plant in Riverside County, California, operated by Hecate Energy Desert Storage 1 LLC. Its oldest generator still running came online in 2025.

Capacity10 MWNameplate, September 2026
Net energy-1.1 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Hecate Energy Desert Storage 1 LLC in context

Among the 156 storage plants in California in the EIA's inventory, it is the 104th largest, about 0.1% of the state's 13 GW of storage capacity.

Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Hecate Energy Desert Storage 1 LLC is 0% of that and the 11th largest of 14 storage plants there.

The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Where it is

Hecate Energy Desert Storage 1 LLC (outlined) and other plants in Riverside County, shaded. 33.808, -116.494.

Plant facts

Operator
Hecate Energy Desert Storage 1 LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Riverside County, CA
EIA plant ID
65635
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
HEDS1 Batteries 10 MW · 20 MWh 2025 –

Questions

Hecate Energy Desert Storage 1 LLC, answered

How much can Hecate Energy Desert Storage 1 LLC store and deliver?

Hecate Energy Desert Storage 1 LLC can deliver up to 10 MW and hold 20 MWh of energy, from one battery or storage system. Its net energy in 2025 was -1.1 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Hecate Energy Desert Storage 1 LLC?

Hecate Energy Desert Storage 1 LLC is in Riverside County, California, at about 33.808°, -116.494°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Who operates Hecate Energy Desert Storage 1 LLC?

It is operated by Hecate Energy Desert Storage 1 LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Hecate Energy Desert Storage 1 LLC open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.