TPC Windfarms LLC is a 29 MW wind power plant in Kern County, California, operated by Terra-Gen Operating Co-Wind. Its oldest generator still running came online in 1986. In 2025 it generated 42 GWh, about what 7,100 average California homes use in a year.
TPC Windfarms LLC in context
Among the 112 wind plants in California in the EIA's inventory, it is the 63rd largest, about 0.4% of the state's 6.6 GW of wind capacity.
Kern County has 268 power plants of 1 MW or more with 19 GW in all; TPC Windfarms LLC is 0% of that and the 32nd largest of 49 wind plants there.
Its capacity factor of 17% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
TPC Windfarms LLC (outlined) and other plants in Kern County, shaded. 35.050, -118.257.
Plant facts
- Operator
- Terra-Gen Operating Co-Wind
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kern County, CA
- EIA plant ID
- 54647
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| EXIS | Onshore Wind Turbine | 29 MW | 1986 | – |
Nearby
Other plants in Kern County
Questions
TPC Windfarms LLC, answered
How much power does TPC Windfarms LLC produce?
TPC Windfarms LLC has 29 MW of capacity from one generator. In 2025 it generated 42 GWh, 17% of the most it could have made running flat out all year (its capacity factor).
How many homes does TPC Windfarms LLC power?
Its 2025 output of 42 GWh equals the yearly electricity use of about 7,100 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is TPC Windfarms LLC?
TPC Windfarms LLC is in Kern County, California, at about 35.050°, -118.257°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.
Who operates TPC Windfarms LLC?
It is operated by Terra-Gen Operating Co-Wind (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did TPC Windfarms LLC open?
Its oldest generator still running came online in 1986.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.