Solar power plant · Kings, CA
CED Avenal
CED Avenal is a 16 MW solar power plant in Kings County, California, operated by RWE Americas, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 16 GWh, about what 2,700 average California homes use in a year.
CED Avenal in context
Among the 967 solar plants in California in the EIA's inventory, it is the 263rd largest, about 0.1% of the state's 32 GW of solar capacity.
Kings County has 52 power plants of 1 MW or more with 2.8 GW in all; CED Avenal is 1% of that and the 21st largest of 41 solar plants there.
Its capacity factor of 12% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
CED Avenal (outlined) and other plants in Kings County, shaded. 35.996, -120.151.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kings County, CA
- EIA plant ID
- 60077
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AVCA | Solar Photovoltaic | 16 MW | 2017 | – |
Questions
CED Avenal, answered
How much power does CED Avenal produce?
CED Avenal has 16 MW of capacity from one generator. In 2025 it generated 16 GWh, 12% of the most it could have made running flat out all year (its capacity factor).
How many homes does CED Avenal power?
Its 2025 output of 16 GWh equals the yearly electricity use of about 2,700 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is CED Avenal?
CED Avenal is in Kings County, California, at about 35.996°, -120.151°. It is one of 52 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Who operates CED Avenal?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did CED Avenal open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.