Storage power plant · San Diego, CA
Melrose BESS
Melrose BESS is a 20 MW storage power plant in San Diego County, California, operated by San Diego Gas & Electric Co. Its oldest generator still running came online in 2024.
Melrose BESS in context
Among the 156 storage plants in California in the EIA's inventory, it is the 91st largest, about 0.1% of the state's 13 GW of storage capacity.
San Diego County has 107 power plants of 1 MW or more with 5.1 GW in all; Melrose BESS is 0% of that and the 16th largest of 33 storage plants there.
The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Melrose BESS (outlined) and other plants in San Diego County, shaded. 33.207, -117.253.
Plant facts
- Operator
- San Diego Gas & Electric Co
- Sector
- Electric Utility
- Grid operator
- CISO
- County
- San Diego County, CA
- EIA plant ID
- 66281
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Batteries | 10 MW · 10 MWh | 2024 | – |
| 2 | Batteries | 10 MW · 10 MWh | 2024 | – |
Questions
Melrose BESS, answered
How much can Melrose BESS store and deliver?
Melrose BESS can deliver up to 20 MW and hold 20 MWh of energy, from 2 storage units. Its net energy in 2025 was -2.4 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Melrose BESS?
Melrose BESS is in San Diego County, California, at about 33.207°, -117.253°. It is one of 107 power plants of 1 MW or more in the county. The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.
Who operates Melrose BESS?
It is operated by San Diego Gas & Electric Co (EIA sector: Electric Utility), and it feeds the California ISO.
When did Melrose BESS open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Methodology.