Solar power plant · Riverside, CA

Arlington Energy Center III

Arlington Energy Center III is a 241 MW solar power plant in Riverside County, California, operated by Arlington Energy Center III. Its oldest generator still running came online in 2022. In 2025 it generated 321 GWh, about what 54,000 average California homes use in a year.

Capacity241 MWNameplate, September 2026
Generated321 GWhIn 2025
Capacity factor15%Share of the most it could make, 2025
Generators2Oldest from 2022

Arlington Energy Center III in context

Among the 967 solar plants in California in the EIA's inventory, it is the 46th largest, about 0.8% of the state's 32 GW of solar capacity.

Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Arlington Energy Center III is 2% of that and the 15th largest of 70 solar plants there.

Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01002003004002022202320242025GWh 321
01002003004002022202320242025321

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Arlington Energy Center III (outlined) and other plants in Riverside County, shaded. 33.691, -114.775.

Plant facts

Operator
Arlington Energy Center III
Sector
IPP Non-CHP
Grid operator
CISO
County
Riverside County, CA
EIA plant ID
64564
  • Solar131 MW54%
  • Storage110 MW46%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
AEC3 Solar Photovoltaic 131 MW 2022 –
AEC3B Batteries 110 MW · 440 MWh 2022 –

Questions

Arlington Energy Center III, answered

How much power does Arlington Energy Center III produce?

Arlington Energy Center III has 241 MW of capacity from 2 generators. In 2025 it generated 321 GWh, 15% of the most it could have made running flat out all year (its capacity factor).

How many homes does Arlington Energy Center III power?

Its 2025 output of 321 GWh equals the yearly electricity use of about 54,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Arlington Energy Center III?

Arlington Energy Center III is in Riverside County, California, at about 33.691°, -114.775°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Who operates Arlington Energy Center III?

It is operated by Arlington Energy Center III (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Arlington Energy Center III open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.