Storage power plant · Kings, CA

Electrolyte BESS

Electrolyte BESS is a 99 MW storage power plant in Kings County, California, operated by Henrietta BESS LLC. Its oldest generator still running came online in 2025.

Capacity99 MWNameplate, September 2026
Net energy-2.9 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Electrolyte BESS in context

Among the 156 storage plants in California in the EIA's inventory, it is the 43rd largest, about 0.7% of the state's 13 GW of storage capacity.

Kings County has 52 power plants of 1 MW or more with 2.8 GW in all; Electrolyte BESS is 4% of that and the 2nd largest of 5 storage plants there.

The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.

Where it is

Electrolyte BESS (outlined) and other plants in Kings County, shaded. 36.240, -119.904.

Plant facts

Operator
Henrietta BESS LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Kings County, CA
EIA plant ID
66661
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
HEN Batteries 99 MW · 99 MWh 2025 –

Questions

Electrolyte BESS, answered

How much can Electrolyte BESS store and deliver?

Electrolyte BESS can deliver up to 99 MW and hold 99 MWh of energy, from one battery or storage system. Its net energy in 2025 was -2.9 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Electrolyte BESS?

Electrolyte BESS is in Kings County, California, at about 36.240°, -119.904°. It is one of 52 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.

Who operates Electrolyte BESS?

It is operated by Henrietta BESS LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Electrolyte BESS open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.