Natural gas power plant · Fresno, CA
Coalinga Cogeneration
Coalinga Cogeneration is a 38 MW natural gas power plant in Fresno County, California, operated by Coalinga Cogeneration Co. Its oldest generator still running came online in 1991.
Coalinga Cogeneration in context
Among the 304 natural gas plants in California in the EIA's inventory, it is the 155th largest, about 0.1% of the state's 41 GW of natural gas capacity.
Fresno County has 105 power plants of 1 MW or more with 5.9 GW in all; Coalinga Cogeneration is 1% of that and the 8th largest of 13 natural gas plants there.
The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Where it is
Coalinga Cogeneration (outlined) and other plants in Fresno County, shaded. 36.181, -120.388.
Plant facts
- Operator
- Coalinga Cogeneration Co
- Sector
- IPP CHP
- Grid operator
- CISO
- County
- Fresno County, CA
- EIA plant ID
- 50131
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| K100 | Natural Gas Fired Combustion Turbine | 38 MW | 1991 | – |
Questions
Coalinga Cogeneration, answered
How much power does Coalinga Cogeneration produce?
Coalinga Cogeneration has 38 MW of capacity from one generator. No full year of generation is reported yet.
Where is Coalinga Cogeneration?
Coalinga Cogeneration is in Fresno County, California, at about 36.181°, -120.388°. It is one of 105 power plants of 1 MW or more in the county. The average electricity customer in Fresno County goes 3.5 hours a year without power, the 48th most of 56 counties in California. The county's page has the full outage record.
Who operates Coalinga Cogeneration?
It is operated by Coalinga Cogeneration Co (EIA sector: IPP CHP), and it feeds the California ISO.
When did Coalinga Cogeneration open?
Its oldest generator still running came online in 1991.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.