Solar power plant · Kern, CA

Beacon Solar Plant Site 5

Beacon Solar Plant Site 5 is a 38 MW solar power plant in Kern County, California, operated by Sune Beacon Site 5, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 89 GWh, about what 15,000 average California homes use in a year.

Capacity38 MWNameplate, September 2026
Generated89 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2017

Beacon Solar Plant Site 5 in context

Among the 967 solar plants in California in the EIA's inventory, it is the 148th largest, about 0.1% of the state's 32 GW of solar capacity.

Kern County has 268 power plants of 1 MW or more with 19 GW in all; Beacon Solar Plant Site 5 is 0% of that and the 47th largest of 158 solar plants there.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608010012020182019202020212022202320242025GWh 89
020406080100120201920212023202589

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Beacon Solar Plant Site 5 (outlined) and other plants in Kern County, shaded. 35.249, -118.034.

Plant facts

Operator
Sune Beacon Site 5, LLC
Sector
IPP Non-CHP
Grid operator
LDWP
County
Kern County, CA
EIA plant ID
59308
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BEAC5 Solar Photovoltaic 38 MW 2017 –

Questions

Beacon Solar Plant Site 5, answered

How much power does Beacon Solar Plant Site 5 produce?

Beacon Solar Plant Site 5 has 38 MW of capacity from one generator. In 2025 it generated 89 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Beacon Solar Plant Site 5 power?

Its 2025 output of 89 GWh equals the yearly electricity use of about 15,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Beacon Solar Plant Site 5?

Beacon Solar Plant Site 5 is in Kern County, California, at about 35.249°, -118.034°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Who operates Beacon Solar Plant Site 5?

It is operated by Sune Beacon Site 5, LLC (EIA sector: IPP Non-CHP), and it feeds the Los Angeles Department of Water and Power.

When did Beacon Solar Plant Site 5 open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.