Storage power plant · Inyo, CA

Mordor ES2

Mordor ES2 is a 20 MW storage power plant in Inyo County, California, operated by Mordor ES2 LLC. Its oldest generator still running came online in 2025.

Capacity20 MWNameplate, September 2026
Net energy-2.1 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Mordor ES2 in context

Among the 156 storage plants in California in the EIA's inventory, it is the 92nd largest, about 0.1% of the state's 13 GW of storage capacity.

Inyo County has 19 power plants of 1 MW or more with 465 MW in all; Mordor ES2 is 4% of that and the 3rd largest of 3 storage plants there.

The average electricity customer in Inyo County goes 13 hours a year without power, the 24th most of 56 counties in California. The county's page has the full outage record.

Where it is

Mordor ES2 (outlined) and other plants in Inyo County, shaded. 36.009, -117.815.

Plant facts

Operator
Mordor ES2 LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Inyo County, CA
EIA plant ID
67829
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MES2 Batteries 20 MW · 80 MWh 2025 –

Questions

Mordor ES2, answered

How much can Mordor ES2 store and deliver?

Mordor ES2 can deliver up to 20 MW and hold 80 MWh of energy, from one battery or storage system. Its net energy in 2025 was -2.1 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Mordor ES2?

Mordor ES2 is in Inyo County, California, at about 36.009°, -117.815°. It is one of 19 power plants of 1 MW or more in the county. The average electricity customer in Inyo County goes 13 hours a year without power, the 24th most of 56 counties in California. The county's page has the full outage record.

Who operates Mordor ES2?

It is operated by Mordor ES2 LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Mordor ES2 open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.