Biomass power plant · Merced, CA
El Nido Facility
El Nido Facility is a 13 MW biomass power plant in Merced County, California, operated by Merced Power LLC. Its oldest generator still running came online in 2008.
El Nido Facility in context
Among the 157 other-fuel plants in California in the EIA's inventory, it is the 72nd largest, about 0.3% of the state's 4.9 GW of other-fuel capacity.
Merced County has 29 power plants of 1 MW or more with 1.0 GW in all; El Nido Facility is 1% of that and the largest of 2 biomass plants there.
The average electricity customer in Merced County goes 2.3 hours a year without power, the 54th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Where it is
El Nido Facility (outlined) and other plants in Merced County, shaded. 37.187, -120.490.
Plant facts
- Operator
- Merced Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Merced County, CA
- EIA plant ID
- 56707
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AMPC | Wood/Wood Waste Biomass | 13 MW | 2008 | – |
Questions
El Nido Facility, answered
How much power does El Nido Facility produce?
El Nido Facility has 13 MW of capacity from one generator. No full year of generation is reported yet.
Where is El Nido Facility?
El Nido Facility is in Merced County, California, at about 37.187°, -120.490°. It is one of 29 power plants of 1 MW or more in the county. The average electricity customer in Merced County goes 2.3 hours a year without power, the 54th most of 56 counties in California. The county's page has the full outage record.
Who operates El Nido Facility?
It is operated by Merced Power LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did El Nido Facility open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Methodology.