Wind power plant · Merced, CA
Dinosaur Point
Dinosaur Point is a 17 MW wind power plant in Merced County, California, operated by International Turbine Res Inc. Its oldest generator still running came online in 1988.
Dinosaur Point in context
Among the 112 wind plants in California in the EIA's inventory, it is the 76th largest, about 0.3% of the state's 6.6 GW of wind capacity.
Merced County has 29 power plants of 1 MW or more with 1.0 GW in all; Dinosaur Point is 2% of that and the 2nd largest of 2 wind plants there.
The average electricity customer in Merced County goes 2.3 hours a year without power, the 54th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Where it is
Dinosaur Point (outlined) and other plants in Merced County, shaded. 37.048, -121.171.
Plant facts
- Operator
- International Turbine Res Inc
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Merced County, CA
- EIA plant ID
- 10005
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WTGS | Onshore Wind Turbine | 17 MW | 1988 | – |
Questions
Dinosaur Point, answered
How much power does Dinosaur Point produce?
Dinosaur Point has 17 MW of capacity from one generator. No full year of generation is reported yet.
Where is Dinosaur Point?
Dinosaur Point is in Merced County, California, at about 37.048°, -121.171°. It is one of 29 power plants of 1 MW or more in the county. The average electricity customer in Merced County goes 2.3 hours a year without power, the 54th most of 56 counties in California. The county's page has the full outage record.
Who operates Dinosaur Point?
It is operated by International Turbine Res Inc (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Dinosaur Point open?
Its oldest generator still running came online in 1988.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Methodology.