Solar power plant · Merced, CA
Wright Solar Park
Wright Solar Park is a 200 MW solar power plant in Merced County, California, operated by Wright Solar Park LLC. Its oldest generator still running came online in 2019. In 2025 it generated 403 GWh, about what 68,000 average California homes use in a year.
Wright Solar Park in context
Among the 967 solar plants in California in the EIA's inventory, it is the 51st largest, about 0.6% of the state's 32 GW of solar capacity.
Merced County has 29 power plants of 1 MW or more with 1.0 GW in all; Wright Solar Park is 19% of that and the largest of 18 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Merced County goes 2.3 hours a year without power, the 54th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wright Solar Park (outlined) and other plants in Merced County, shaded. 37.009, -120.957.
Plant facts
- Operator
- Wright Solar Park LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Merced County, CA
- EIA plant ID
- 59525
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FRWSP | Solar Photovoltaic | 200 MW | 2019 | – |
Questions
Wright Solar Park, answered
How much power does Wright Solar Park produce?
Wright Solar Park has 200 MW of capacity from one generator. In 2025 it generated 403 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wright Solar Park power?
Its 2025 output of 403 GWh equals the yearly electricity use of about 68,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wright Solar Park?
Wright Solar Park is in Merced County, California, at about 37.009°, -120.957°. It is one of 29 power plants of 1 MW or more in the county. The average electricity customer in Merced County goes 2.3 hours a year without power, the 54th most of 56 counties in California. The county's page has the full outage record.
Who operates Wright Solar Park?
It is operated by Wright Solar Park LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Wright Solar Park open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.