Solar power plant · San Bernardino, CA

Lockhart Solar PV II

Lockhart Solar PV II is a 144 MW solar power plant in San Bernardino County, California, operated by Terra-Gen Operating Co-Solar. Its oldest generator still running came online in 2023. In 2025 it generated 204 GWh, about what 34,000 average California homes use in a year.

Capacity144 MWNameplate, September 2026
Generated204 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2023

Lockhart Solar PV II in context

Among the 967 solar plants in California in the EIA's inventory, it is the 78th largest, about 0.5% of the state's 32 GW of solar capacity.

San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Lockhart Solar PV II is 2% of that and the 10th largest of 91 solar plants there.

The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150200250202320242025GWh 204
050100150200250202320242025204

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Lockhart Solar PV II (outlined) and other plants in San Bernardino County, shaded. 35.044, -117.349.

Plant facts

Operator
Terra-Gen Operating Co-Solar
Sector
IPP Non-CHP
Grid operator
CISO
County
San Bernardino County, CA
EIA plant ID
66699
  • Solar84 MW59%
  • Storage60 MW41%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
LOC2 Solar Photovoltaic 84 MW 2023 –
LHC2 Batteries 60 MW · 60 MWh 2025 –

Questions

Lockhart Solar PV II, answered

How much power does Lockhart Solar PV II produce?

Lockhart Solar PV II has 144 MW of capacity from 2 generators. In 2025 it generated 204 GWh.

How many homes does Lockhart Solar PV II power?

Its 2025 output of 204 GWh equals the yearly electricity use of about 34,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Lockhart Solar PV II?

Lockhart Solar PV II is in San Bernardino County, California, at about 35.044°, -117.349°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.

Who operates Lockhart Solar PV II?

It is operated by Terra-Gen Operating Co-Solar (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Lockhart Solar PV II open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.