Solar power plant · Kern, CA

Orion Solar I

Orion Solar I is a 12 MW solar power plant in Kern County, California, operated by Orion Solar I LLC. Its oldest generator still running came online in 2014. In 2025 it generated 27 GWh, about what 4,600 average California homes use in a year.

Capacity12 MWNameplate, September 2026
Generated27 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 2014

Orion Solar I in context

Among the 967 solar plants in California in the EIA's inventory, it is the 279th largest, about 0.0% of the state's 32 GW of solar capacity.

Kern County has 268 power plants of 1 MW or more with 19 GW in all; Orion Solar I is 0% of that and the 82nd largest of 158 solar plants there.

Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608010020182019202020212022202320242025GWh 27
020406080100201920212023202527

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Orion Solar I (outlined) and other plants in Kern County, shaded. 35.151, -118.875.

Plant facts

Operator
Orion Solar I LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Kern County, CA
EIA plant ID
58718
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 12 MW 2014 –

Questions

Orion Solar I, answered

How much power does Orion Solar I produce?

Orion Solar I has 12 MW of capacity from one generator. In 2025 it generated 27 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Orion Solar I power?

Its 2025 output of 27 GWh equals the yearly electricity use of about 4,600 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Orion Solar I?

Orion Solar I is in Kern County, California, at about 35.151°, -118.875°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Who operates Orion Solar I?

It is operated by Orion Solar I LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Orion Solar I open?

Its oldest generator still running came online in 2014.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.