Oil power plant · Santa Clara, CA

SC 1 Data Center, Phase 2

SC 1 Data Center, Phase 2 is a 100 MW oil power plant in Santa Clara County, California, operated by Xeres Ventures LLC. Its oldest generator still running came online in 2011. In 2025 it generated 0.4 GWh, about what 67 average California homes use in a year.

Capacity100 MWNameplate, September 2026
Generated0.4 GWhIn 2025
Capacity factor0%Share of the most it could make, 2025
Generators44Oldest from 2011

SC 1 Data Center, Phase 2 in context

Among the 157 other-fuel plants in California in the EIA's inventory, it is the 7th largest, about 2.0% of the state's 4.9 GW of other-fuel capacity.

Santa Clara County has 53 power plants of 1 MW or more with 1.9 GW in all; SC 1 Data Center, Phase 2 is 5% of that and the largest of 11 oil plants there.

The average electricity customer in Santa Clara County goes 4.7 hours a year without power, the 38th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01122320182019202020212022202320242025GWh 0
01122320192021202320250

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

SC 1 Data Center, Phase 2 (outlined) and other plants in Santa Clara County, shaded. 37.362, -121.944.

Plant facts

Operator
Xeres Ventures LLC
Sector
Commercial Non-CHP
Grid operator
CISO
County
Santa Clara County, CA
EIA plant ID
59074
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
14B Petroleum Liquids 2.3 MW 2014 –
EG10A Petroleum Liquids 2.3 MW 2014 –
EG10B Petroleum Liquids 2.3 MW 2014 –
EG11A Petroleum Liquids 2.3 MW 2014 –
EG11B Petroleum Liquids 2.3 MW 2014 –
EG12A Petroleum Liquids 2.3 MW 2014 –
EG12B Petroleum Liquids 2.3 MW 2014 –
EG13A Petroleum Liquids 2.3 MW 2014 –
EG13B Petroleum Liquids 2.3 MW 2014 –
EG14A Petroleum Liquids 2.3 MW 2014 –
EG9B Petroleum Liquids 2.3 MW 2014 –
EG15A Petroleum Liquids 2.3 MW 2015 –
EG15B Petroleum Liquids 2.3 MW 2015 –
EG16A Petroleum Liquids 2.3 MW 2015 –
EG16B Petroleum Liquids 2.3 MW 2015 –

Retired

GeneratorTechnologyCapacityOnlineRetired
EG8APetroleum Liquids2.2 MW20112020

Questions

SC 1 Data Center, Phase 2, answered

How much power does SC 1 Data Center, Phase 2 produce?

SC 1 Data Center, Phase 2 has 100 MW of capacity from 44 generators. In 2025 it generated 0.4 GWh, 0% of the most it could have made running flat out all year (its capacity factor).

How many homes does SC 1 Data Center, Phase 2 power?

Its 2025 output of 0.4 GWh equals the yearly electricity use of about 67 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is SC 1 Data Center, Phase 2?

SC 1 Data Center, Phase 2 is in Santa Clara County, California, at about 37.362°, -121.944°. It is one of 53 power plants of 1 MW or more in the county. The average electricity customer in Santa Clara County goes 4.7 hours a year without power, the 38th most of 56 counties in California. The county's page has the full outage record.

Who operates SC 1 Data Center, Phase 2?

It is operated by Xeres Ventures LLC (EIA sector: Commercial Non-CHP), and it feeds the California ISO.

When did SC 1 Data Center, Phase 2 open?

Its oldest generator still running came online in 2011.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.