Wind power plant · Riverside, CA
Salka Cabazon Wind
Salka Cabazon Wind is a 39 MW wind power plant in Riverside County, California, operated by Salka Cabazon Wind LLC. Its oldest generator still running came online in 1999. In 2025 it generated 13 GWh, about what 2,200 average California homes use in a year.
Salka Cabazon Wind in context
Among the 112 wind plants in California in the EIA's inventory, it is the 56th largest, about 0.6% of the state's 6.6 GW of wind capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Salka Cabazon Wind is 0% of that and the 10th largest of 22 wind plants there.
Its capacity factor of 4% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Salka Cabazon Wind (outlined) and other plants in Riverside County, shaded. 33.915, -116.710.
Plant facts
- Operator
- Salka Cabazon Wind LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 50552
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WGNS | Onshore Wind Turbine | 39 MW | 1999 | – |
Questions
Salka Cabazon Wind, answered
How much power does Salka Cabazon Wind produce?
Salka Cabazon Wind has 39 MW of capacity from one generator. In 2025 it generated 13 GWh, 4% of the most it could have made running flat out all year (its capacity factor).
How many homes does Salka Cabazon Wind power?
Its 2025 output of 13 GWh equals the yearly electricity use of about 2,200 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Salka Cabazon Wind?
Salka Cabazon Wind is in Riverside County, California, at about 33.915°, -116.710°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates Salka Cabazon Wind?
It is operated by Salka Cabazon Wind LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Salka Cabazon Wind open?
Its oldest generator still running came online in 1999.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.