Natural gas power plant · San Diego, CA
Goal Line LP
Goal Line LP is a 51 MW natural gas power plant in San Diego County, California, operated by Goal Line LP. Its oldest generator still running came online in 1994. In 2025 it generated 7.4 GWh, about what 1,200 average California homes use in a year.
Goal Line LP in context
Among the 304 natural gas plants in California in the EIA's inventory, it is the 108th largest, about 0.1% of the state's 41 GW of natural gas capacity.
San Diego County has 107 power plants of 1 MW or more with 5.1 GW in all; Goal Line LP is 1% of that and the 12th largest of 29 natural gas plants there.
Its capacity factor of 2% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Goal Line LP (outlined) and other plants in San Diego County, shaded. 33.118, -117.100.
Plant facts
- Operator
- Goal Line LP
- Sector
- IPP CHP
- Grid operator
- CISO
- County
- San Diego County, CA
- EIA plant ID
- 54749
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CTG | Natural Gas Fired Combined Cycle | 41 MW | 1994 | – |
| STG | Natural Gas Fired Combined Cycle | 10 MW | 1994 | – |
Questions
Goal Line LP, answered
How much power does Goal Line LP produce?
Goal Line LP has 51 MW of capacity from 2 generators. In 2025 it generated 7.4 GWh, 2% of the most it could have made running flat out all year (its capacity factor).
How many homes does Goal Line LP power?
Its 2025 output of 7.4 GWh equals the yearly electricity use of about 1,200 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Goal Line LP?
Goal Line LP is in San Diego County, California, at about 33.118°, -117.100°. It is one of 107 power plants of 1 MW or more in the county. The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.
Who operates Goal Line LP?
It is operated by Goal Line LP (EIA sector: IPP CHP), and it feeds the California ISO.
When did Goal Line LP open?
Its oldest generator still running came online in 1994.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.