Storage power plant · Imperial, CA
CED West Side Canal Battery Storage
CED West Side Canal Battery Storage is a 131 MW storage power plant in Imperial County, California, operated by San Diego Gas & Electric Co. Its oldest generator still running came online in 2023.
CED West Side Canal Battery Storage in context
Among the 156 storage plants in California in the EIA's inventory, it is the 23rd largest, about 1.0% of the state's 13 GW of storage capacity.
Imperial County has 73 power plants of 1 MW or more with 4.6 GW in all; CED West Side Canal Battery Storage is 3% of that and the 3rd largest of 5 storage plants there.
The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
CED West Side Canal Battery Storage (outlined) and other plants in Imperial County, shaded. 32.729, -115.719.
Plant facts
- Operator
- San Diego Gas & Electric Co
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Imperial County, CA
- EIA plant ID
- 65980
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WCBS | Batteries | 131 MW · 524 MWh | 2023 | – |
Questions
CED West Side Canal Battery Storage, answered
How much can CED West Side Canal Battery Storage store and deliver?
CED West Side Canal Battery Storage can deliver up to 131 MW and hold 524 MWh of energy, from one battery or storage system. Its net energy in 2025 was -30.9 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is CED West Side Canal Battery Storage?
CED West Side Canal Battery Storage is in Imperial County, California, at about 32.729°, -115.719°. It is one of 73 power plants of 1 MW or more in the county. The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.
Who operates CED West Side Canal Battery Storage?
It is operated by San Diego Gas & Electric Co (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did CED West Side Canal Battery Storage open?
Its oldest generator still running came online in 2023.