Solar power plant · Imperial, CA

Campo Verde Solar

Campo Verde Solar is a 147 MW solar power plant in Imperial County, California, operated by Southern Power Co. Its oldest generator still running came online in 2013. In 2025 it generated 293 GWh, about what 49,000 average California homes use in a year.

Capacity147 MWNameplate, September 2026
Generated293 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2013

Campo Verde Solar in context

Among the 967 solar plants in California in the EIA's inventory, it is the 77th largest, about 0.5% of the state's 32 GW of solar capacity.

Imperial County has 73 power plants of 1 MW or more with 4.6 GW in all; Campo Verde Solar is 3% of that and the 7th largest of 36 solar plants there.

Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020182019202020212022202320242025GWh 293
01002003004002019202120232025293

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Campo Verde Solar (outlined) and other plants in Imperial County, shaded. 32.753, -115.726.

Plant facts

Operator
Southern Power Co
Sector
IPP Non-CHP
Grid operator
CISO
County
Imperial County, CA
EIA plant ID
58467
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CVS1 Solar Photovoltaic 147 MW 2013 –

Questions

Campo Verde Solar, answered

How much power does Campo Verde Solar produce?

Campo Verde Solar has 147 MW of capacity from one generator. In 2025 it generated 293 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Campo Verde Solar power?

Its 2025 output of 293 GWh equals the yearly electricity use of about 49,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Campo Verde Solar?

Campo Verde Solar is in Imperial County, California, at about 32.753°, -115.726°. It is one of 73 power plants of 1 MW or more in the county. The average electricity customer in Imperial County goes 4.4 hours a year without power, the 42nd most of 56 counties in California. The county's page has the full outage record.

Who operates Campo Verde Solar?

It is operated by Southern Power Co (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Campo Verde Solar open?

Its oldest generator still running came online in 2013.