Aratina Solar Center 1B is a 130 MW solar power plant in San Bernardino County, California, operated by 91MC 8me LLC. Its oldest generator still running came online in 2026.

Capacity130 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators2Oldest from 2026

Aratina Solar Center 1B in context

Among the 967 solar plants in California in the EIA's inventory, it is the 84th largest, about 0.4% of the state's 32 GW of solar capacity.

San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Aratina Solar Center 1B is 2% of that and the 13th largest of 91 solar plants there.

The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.

Where it is

Aratina Solar Center 1B (outlined) and other plants in San Bernardino County, shaded. 34.988, -117.572.

Plant facts

Operator
91MC 8me LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
San Bernardino County, CA
EIA plant ID
61167
  • Solar80 MW62%
  • Storage50 MW38%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
91MC8 Solar Photovoltaic 80 MW 2026 –
BESS Batteries 50 MW · 200 MWh 2026 –

Questions

Aratina Solar Center 1B, answered

How much power does Aratina Solar Center 1B produce?

Aratina Solar Center 1B has 130 MW of capacity from 2 generators. No full year of generation is reported yet.

Where is Aratina Solar Center 1B?

Aratina Solar Center 1B is in San Bernardino County, California, at about 34.988°, -117.572°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.

Who operates Aratina Solar Center 1B?

It is operated by 91MC 8me LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Aratina Solar Center 1B open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.