Storage power plant · San Diego, CA
Pome BESS
Pome BESS is a 100 MW storage power plant in San Diego County, California, operated by MN8 Energy LLC. Its oldest generator still running came online in 2025.
Pome BESS in context
Among the 156 storage plants in California in the EIA's inventory, it is the 40th largest, about 0.7% of the state's 13 GW of storage capacity.
San Diego County has 107 power plants of 1 MW or more with 5.1 GW in all; Pome BESS is 2% of that and the 5th largest of 33 storage plants there.
The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.
Where it is
Pome BESS (outlined) and other plants in San Diego County, shaded. 32.940, -117.032.
Plant facts
- Operator
- MN8 Energy LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- San Diego County, CA
- EIA plant ID
- 67299
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 10101 | Batteries | 100 MW · 400 MWh | 2025 | – |
Questions
Pome BESS, answered
How much can Pome BESS store and deliver?
Pome BESS can deliver up to 100 MW and hold 400 MWh of energy, from one battery or storage system. Its net energy in 2025 was -7.9 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Pome BESS?
Pome BESS is in San Diego County, California, at about 32.940°, -117.032°. It is one of 107 power plants of 1 MW or more in the county. The average electricity customer in San Diego County goes 3.3 hours a year without power, the 49th most of 56 counties in California. The county's page has the full outage record.
Who operates Pome BESS?
It is operated by MN8 Energy LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Pome BESS open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.