Wind power plant · Alameda, CA
Golden Hills North Wind Energy Center
Golden Hills North Wind Energy Center is a 46 MW wind power plant in Alameda County, California, operated by Golden Hills Interconnection Wind, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 143 GWh, about what 24,000 average California homes use in a year.
Golden Hills North Wind Energy Center in context
Among the 112 wind plants in California in the EIA's inventory, it is the 51st largest, about 0.7% of the state's 6.6 GW of wind capacity.
Alameda County has 33 power plants of 1 MW or more with 1.6 GW in all; Golden Hills North Wind Energy Center is 3% of that and the 3rd largest of 4 wind plants there.
Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Alameda County goes 3.6 hours a year without power, the 47th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Golden Hills North Wind Energy Center (outlined) and other plants in Alameda County, shaded. 37.769, -121.630.
Plant facts
- Operator
- Golden Hills Interconnection Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Alameda County, CA
- EIA plant ID
- 61222
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 46 MW | 2017 | – |
Questions
Golden Hills North Wind Energy Center, answered
How much power does Golden Hills North Wind Energy Center produce?
Golden Hills North Wind Energy Center has 46 MW of capacity from one generator. In 2025 it generated 143 GWh, 35% of the most it could have made running flat out all year (its capacity factor).
How many homes does Golden Hills North Wind Energy Center power?
Its 2025 output of 143 GWh equals the yearly electricity use of about 24,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Golden Hills North Wind Energy Center?
Golden Hills North Wind Energy Center is in Alameda County, California, at about 37.769°, -121.630°. It is one of 33 power plants of 1 MW or more in the county. The average electricity customer in Alameda County goes 3.6 hours a year without power, the 47th most of 56 counties in California. The county's page has the full outage record.
Who operates Golden Hills North Wind Energy Center?
It is operated by Golden Hills Interconnection Wind, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Golden Hills North Wind Energy Center open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.