Solar power plant · Alameda, CA
Aramis I Solar Project
Aramis I Solar Project is a 200 MW solar power plant in Alameda County, California, operated by IPX Power USA, LLC. Its oldest generator still running came online in 2026.
Aramis I Solar Project in context
Among the 967 solar plants in California in the EIA's inventory, it is the 54th largest, about 0.6% of the state's 32 GW of solar capacity.
Alameda County has 33 power plants of 1 MW or more with 1.6 GW in all; Aramis I Solar Project is 13% of that and the largest of 11 solar plants there.
The average electricity customer in Alameda County goes 3.6 hours a year without power, the 47th most of 56 counties in California. The county's page has the full outage record.
Where it is
Aramis I Solar Project (outlined) and other plants in Alameda County, shaded. 37.750, -121.766.
Plant facts
- Operator
- IPX Power USA, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Alameda County, CA
- EIA plant ID
- 66678
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| IPAR1 | Solar Photovoltaic | 100 MW | 2026 | – |
| IPARB | Batteries | 100 MW · 400 MWh | 2026 | – |
Questions
Aramis I Solar Project, answered
How much power does Aramis I Solar Project produce?
Aramis I Solar Project has 200 MW of capacity from 2 generators. No full year of generation is reported yet.
Where is Aramis I Solar Project?
Aramis I Solar Project is in Alameda County, California, at about 37.750°, -121.766°. It is one of 33 power plants of 1 MW or more in the county. The average electricity customer in Alameda County goes 3.6 hours a year without power, the 47th most of 56 counties in California. The county's page has the full outage record.
Who operates Aramis I Solar Project?
It is operated by IPX Power USA, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Aramis I Solar Project open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.