Pebbly Beach Generating Station Hybrid is a 13 MW oil power plant in Los Angeles County, California, operated by Southern California Edison Co. Its oldest generator still running came online in 1958. In 2025 it generated 28 GWh, about what 4,800 average California homes use in a year.

Capacity13 MWNameplate, September 2026
Generated28 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators30Oldest from 1958

Pebbly Beach Generating Station Hybrid in context

Among the 157 other-fuel plants in California in the EIA's inventory, it is the 70th largest, about 0.3% of the state's 4.9 GW of other-fuel capacity.

Los Angeles County has 254 power plants of 1 MW or more with 14 GW in all; Pebbly Beach Generating Station Hybrid is 0% of that and the 10th largest of 19 oil plants there.

Its capacity factor of 25% in 2025 is close to the 25% typical for oil plants across the US.

The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01020304020182019202020212022202320242025GWh 28
010203040201920212023202528

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Pebbly Beach Generating Station Hybrid (outlined) and other plants in Los Angeles County, shaded. 33.333, -118.310.

Plant facts

Operator
Southern California Edison Co
Sector
Electric Utility
Grid operator
CISO
County
Los Angeles County, CA
EIA plant ID
6704
  • Other12 MW92%
  • Storage1.0 MW7.9%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
15 Petroleum Liquids 2.8 MW 1995 –
12 Petroleum Liquids 1.6 MW 1976 –
8 Petroleum Liquids 1.5 MW 1963 –
14 Petroleum Liquids 1.4 MW 1986 –
10 Petroleum Liquids 1.1 MW 1966 –
7 Petroleum Liquids 1.0 MW 1958 –
NASB1 Batteries 1.0 MW · 7 MWh 2012 –
MT01 Petroleum Liquids 0.1 MW 2011 –
MT02 Petroleum Liquids 0.1 MW 2011 –
MT03 Petroleum Liquids 0.1 MW 2011 –
MT04 Petroleum Liquids 0.1 MW 2011 –
MT05 Petroleum Liquids 0.1 MW 2011 –
MT06 Petroleum Liquids 0.1 MW 2011 –
MT07 Petroleum Liquids 0.1 MW 2011 –
MT08 Petroleum Liquids 0.1 MW 2011 –

Questions

Pebbly Beach Generating Station Hybrid, answered

How much power does Pebbly Beach Generating Station Hybrid produce?

Pebbly Beach Generating Station Hybrid has 13 MW of capacity from 30 generators. In 2025 it generated 28 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Pebbly Beach Generating Station Hybrid power?

Its 2025 output of 28 GWh equals the yearly electricity use of about 4,800 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Pebbly Beach Generating Station Hybrid?

Pebbly Beach Generating Station Hybrid is in Los Angeles County, California, at about 33.333°, -118.310°. It is one of 254 power plants of 1 MW or more in the county. The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Who operates Pebbly Beach Generating Station Hybrid?

It is operated by Southern California Edison Co (EIA sector: Electric Utility), and it feeds the California ISO.

When did Pebbly Beach Generating Station Hybrid open?

Its oldest generator still running came online in 1958.