Solar power plant · San Bernardino, CA
Desert Breeze Solar, LLC
Desert Breeze Solar, LLC is a 125 MW solar power plant in San Bernardino County, California, operated by Terra-Gen Operating Co-Solar. Its oldest generator still running came online in 2026.
Desert Breeze Solar, LLC in context
Among the 967 solar plants in California in the EIA's inventory, it is the 89th largest, about 0.4% of the state's 32 GW of solar capacity.
San Bernardino County has 129 power plants of 1 MW or more with 7.1 GW in all; Desert Breeze Solar, LLC is 2% of that and the 15th largest of 91 solar plants there.
The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Where it is
Desert Breeze Solar, LLC (outlined) and other plants in San Bernardino County, shaded. 35.038, -117.347.
Plant facts
- Operator
- Terra-Gen Operating Co-Solar
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- San Bernardino County, CA
- EIA plant ID
- 68045
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LOC3 | Solar Photovoltaic | 125 MW | 2026 | – |
Questions
Desert Breeze Solar, LLC, answered
How much power does Desert Breeze Solar, LLC produce?
Desert Breeze Solar, LLC has 125 MW of capacity from one generator. No full year of generation is reported yet.
Where is Desert Breeze Solar, LLC?
Desert Breeze Solar, LLC is in San Bernardino County, California, at about 35.038°, -117.347°. It is one of 129 power plants of 1 MW or more in the county. The average electricity customer in San Bernardino County goes 6.8 hours a year without power, the 33rd most of 56 counties in California. The county's page has the full outage record.
Who operates Desert Breeze Solar, LLC?
It is operated by Terra-Gen Operating Co-Solar (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Desert Breeze Solar, LLC open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.