Solar power plant · Tulare, CA
White River Solar 2
White River Solar 2 is a 20 MW solar power plant in Tulare County, California, operated by RWE Americas, LLC. Its oldest generator still running came online in 2014. In 2025 it generated 49 GWh, about what 8,300 average California homes use in a year.
White River Solar 2 in context
Among the 967 solar plants in California in the EIA's inventory, it is the 249th largest, about 0.1% of the state's 32 GW of solar capacity.
Tulare County has 66 power plants of 1 MW or more with 1.4 GW in all; White River Solar 2 is 1% of that and the 12th largest of 49 solar plants there.
Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Tulare County goes 4.2 hours a year without power, the 44th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
White River Solar 2 (outlined) and other plants in Tulare County, shaded. 35.875, -119.046.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Tulare County, CA
- EIA plant ID
- 58973
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| W2CA | Solar Photovoltaic | 20 MW | 2014 | – |
Questions
White River Solar 2, answered
How much power does White River Solar 2 produce?
White River Solar 2 has 20 MW of capacity from one generator. In 2025 it generated 49 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does White River Solar 2 power?
Its 2025 output of 49 GWh equals the yearly electricity use of about 8,300 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is White River Solar 2?
White River Solar 2 is in Tulare County, California, at about 35.875°, -119.046°. It is one of 66 power plants of 1 MW or more in the county. The average electricity customer in Tulare County goes 4.2 hours a year without power, the 44th most of 56 counties in California. The county's page has the full outage record.
Who operates White River Solar 2?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did White River Solar 2 open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.