Storage power plant · Tulare, CA

Angela Solar Project

Angela Solar Project is a 80 MW storage power plant in Tulare County, California, operated by Angiola East LLC. Its oldest generator still running came online in 2026.

Capacity80 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators2Oldest from 2026

Angela Solar Project in context

Among the 156 storage plants in California in the EIA's inventory, it is the 52nd largest, about 0.6% of the state's 13 GW of storage capacity.

Tulare County has 66 power plants of 1 MW or more with 1.4 GW in all; Angela Solar Project is 6% of that and the 4th largest of 5 storage plants there.

The average electricity customer in Tulare County goes 4.2 hours a year without power, the 44th most of 56 counties in California. The county's page has the full outage record.

Where it is

Angela Solar Project (outlined) and other plants in Tulare County, shaded. 35.866, -119.456.

Plant facts

Operator
Angiola East LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Tulare County, CA
EIA plant ID
68854
  • Solar40 MW50%
  • Storage40 MW50%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ABESS Batteries 40 MW · 80 MWh 2026 –
ANG1 Solar Photovoltaic 40 MW 2026 –

Questions

Angela Solar Project, answered

How much can Angela Solar Project store and deliver?

Angela Solar Project can deliver up to 80 MW and hold 80 MWh of energy, from 2 storage units.

Where is Angela Solar Project?

Angela Solar Project is in Tulare County, California, at about 35.866°, -119.456°. It is one of 66 power plants of 1 MW or more in the county. The average electricity customer in Tulare County goes 4.2 hours a year without power, the 44th most of 56 counties in California. The county's page has the full outage record.

Who operates Angela Solar Project?

It is operated by Angiola East LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Angela Solar Project open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.