Storage power plant · Tulare, CA

Deer Creek Hybrid

Deer Creek Hybrid is a 103 MW storage power plant in Tulare County, California, operated by Deer Creek Solar I, LLC. Its oldest generator still running came online in 2026.

Capacity103 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators2Oldest from 2026

Deer Creek Hybrid in context

Among the 156 storage plants in California in the EIA's inventory, it is the 32nd largest, about 0.8% of the state's 13 GW of storage capacity.

Tulare County has 66 power plants of 1 MW or more with 1.4 GW in all; Deer Creek Hybrid is 7% of that and the largest of 5 storage plants there.

The average electricity customer in Tulare County goes 4.2 hours a year without power, the 44th most of 56 counties in California. The county's page has the full outage record.

Where it is

Deer Creek Hybrid (outlined) and other plants in Tulare County, shaded. 35.965, -119.070.

Plant facts

Operator
Deer Creek Solar I, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Tulare County, CA
EIA plant ID
69121
  • Solar51 MW50%
  • Storage51 MW50%
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
DERBA Batteries 51 MW · 200 MWh 2026 –
DERPV Solar Photovoltaic 51 MW 2026 –

Questions

Deer Creek Hybrid, answered

How much can Deer Creek Hybrid store and deliver?

Deer Creek Hybrid can deliver up to 103 MW and hold 200 MWh of energy, from 2 storage units.

Where is Deer Creek Hybrid?

Deer Creek Hybrid is in Tulare County, California, at about 35.965°, -119.070°. It is one of 66 power plants of 1 MW or more in the county. The average electricity customer in Tulare County goes 4.2 hours a year without power, the 44th most of 56 counties in California. The county's page has the full outage record.

Who operates Deer Creek Hybrid?

It is operated by Deer Creek Solar I, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Deer Creek Hybrid open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.