Solar power plant · Los Angeles, CA

Solverde 1

Solverde 1 is a 85 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy. Its oldest generator still running came online in 2016. In 2025 it generated 206 GWh, about what 35,000 average California homes use in a year.

Capacity85 MWNameplate, September 2026
Generated206 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2016

Solverde 1 in context

Among the 967 solar plants in California in the EIA's inventory, it is the 109th largest, about 0.3% of the state's 32 GW of solar capacity.

Los Angeles County has 254 power plants of 1 MW or more with 14 GW in all; Solverde 1 is 1% of that and the 5th largest of 149 solar plants there.

Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020182019202020212022202320242025GWh 206
0501001502002502019202120232025206

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Solverde 1 (outlined) and other plants in Los Angeles County, shaded. 34.656, -118.298.

Plant facts

Operator
AES Distributed Energy
Sector
IPP Non-CHP
Grid operator
CISO
County
Los Angeles County, CA
EIA plant ID
60185
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SOLV1 Solar Photovoltaic 85 MW 2016 –

Questions

Solverde 1, answered

How much power does Solverde 1 produce?

Solverde 1 has 85 MW of capacity from one generator. In 2025 it generated 206 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does Solverde 1 power?

Its 2025 output of 206 GWh equals the yearly electricity use of about 35,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Solverde 1?

Solverde 1 is in Los Angeles County, California, at about 34.656°, -118.298°. It is one of 254 power plants of 1 MW or more in the county. The average electricity customer in Los Angeles County goes 4.5 hours a year without power, the 41st most of 56 counties in California. The county's page has the full outage record.

Who operates Solverde 1?

It is operated by AES Distributed Energy (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Solverde 1 open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.