Wind power plant · Kern, CA

Alta Wind VIII

Alta Wind VIII is a 150 MW wind power plant in Kern County, California, operated by Nextera Energy Resources. Its oldest generator still running came online in 2012. In 2025 it generated 219 GWh, about what 37,000 average California homes use in a year.

Capacity150 MWNameplate, September 2026
Generated219 GWhIn 2025
Capacity factor17%Share of the most it could make, 2025
Generators1Oldest from 2012

Alta Wind VIII in context

Among the 112 wind plants in California in the EIA's inventory, it is the 15th largest, about 2.3% of the state's 6.6 GW of wind capacity.

Kern County has 268 power plants of 1 MW or more with 19 GW in all; Alta Wind VIII is 1% of that and the 10th largest of 49 wind plants there.

Its capacity factor of 17% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030020182019202020212022202320242025GWh 219
01002003002019202120232025219

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Alta Wind VIII (outlined) and other plants in Kern County, shaded. 35.027, -118.235.

Plant facts

Operator
Nextera Energy Resources
Sector
IPP Non-CHP
Grid operator
CISO
County
Kern County, CA
EIA plant ID
57835
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
AW08 Onshore Wind Turbine 150 MW 2012 –

Questions

Alta Wind VIII, answered

How much power does Alta Wind VIII produce?

Alta Wind VIII has 150 MW of capacity from one generator. In 2025 it generated 219 GWh, 17% of the most it could have made running flat out all year (its capacity factor).

How many homes does Alta Wind VIII power?

Its 2025 output of 219 GWh equals the yearly electricity use of about 37,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Alta Wind VIII?

Alta Wind VIII is in Kern County, California, at about 35.027°, -118.235°. It is one of 268 power plants of 1 MW or more in the county. The average electricity customer in Kern County goes 4.3 hours a year without power, the 43rd most of 56 counties in California. The county's page has the full outage record.

Who operates Alta Wind VIII?

It is operated by Nextera Energy Resources (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Alta Wind VIII open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.