Solar power plant · Kings, CA
Kettleman Solar -Centaurus
Kettleman Solar -Centaurus is a 20 MW solar power plant in Kings County, California, operated by Boralex US Operations LLC. Its oldest generator still running came online in 2015. In 2025 it generated 43 GWh, about what 7,200 average California homes use in a year.
Kettleman Solar -Centaurus in context
Among the 967 solar plants in California in the EIA's inventory, it is the 207th largest, about 0.1% of the state's 32 GW of solar capacity.
Kings County has 52 power plants of 1 MW or more with 2.8 GW in all; Kettleman Solar -Centaurus is 1% of that and the 16th largest of 41 solar plants there.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Kettleman Solar -Centaurus (outlined) and other plants in Kings County, shaded. 36.051, -119.948.
Plant facts
- Operator
- Boralex US Operations LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Kings County, CA
- EIA plant ID
- 59633
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| KS | Solar Photovoltaic | 20 MW | 2015 | – |
Questions
Kettleman Solar -Centaurus, answered
How much power does Kettleman Solar -Centaurus produce?
Kettleman Solar -Centaurus has 20 MW of capacity from one generator. In 2025 it generated 43 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Kettleman Solar -Centaurus power?
Its 2025 output of 43 GWh equals the yearly electricity use of about 7,200 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Kettleman Solar -Centaurus?
Kettleman Solar -Centaurus is in Kings County, California, at about 36.051°, -119.948°. It is one of 52 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.
Who operates Kettleman Solar -Centaurus?
It is operated by Boralex US Operations LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Kettleman Solar -Centaurus open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.