Storage power plant · San Joaquin, CA

North Central Valley

North Central Valley is a 132 MW storage power plant in San Joaquin County, California, operated by North Central Valley Energy Storage, LLC. Its oldest generator still running came online in 2023.

Capacity132 MWNameplate, September 2026
Net energy-22.6 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2023

North Central Valley in context

Among the 156 storage plants in California in the EIA's inventory, it is the 22nd largest, about 1.0% of the state's 13 GW of storage capacity.

San Joaquin County has 38 power plants of 1 MW or more with 1.6 GW in all; North Central Valley is 8% of that and the 2nd largest of 5 storage plants there.

The average electricity customer in San Joaquin County goes 4.0 hours a year without power, the 45th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.

0001111202320242025GWh -23
0001111202320242025-23

Where it is

North Central Valley (outlined) and other plants in San Joaquin County, shaded. 38.015, -121.018.

Plant facts

Operator
North Central Valley Energy Storage, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
San Joaquin County, CA
EIA plant ID
66208
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
NCV Batteries 132 MW · 528 MWh 2023 –

Questions

North Central Valley, answered

How much can North Central Valley store and deliver?

North Central Valley can deliver up to 132 MW and hold 528 MWh of energy, from one battery or storage system. Its net energy in 2025 was -22.6 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is North Central Valley?

North Central Valley is in San Joaquin County, California, at about 38.015°, -121.018°. It is one of 38 power plants of 1 MW or more in the county. The average electricity customer in San Joaquin County goes 4.0 hours a year without power, the 45th most of 56 counties in California. The county's page has the full outage record.

Who operates North Central Valley?

It is operated by North Central Valley Energy Storage, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did North Central Valley open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Methodology.