Biomass power plant · San Joaquin, CA
Stockton Biomass
Stockton Biomass is a 54 MW biomass power plant in San Joaquin County, California, operated by DTE Stockton LLC. Its oldest generator still running came online in 1987. In 2025 it generated 356 GWh, about what 60,000 average California homes use in a year.
Stockton Biomass in context
Among the 157 other-fuel plants in California in the EIA's inventory, it is the 22nd largest, about 1.1% of the state's 4.9 GW of other-fuel capacity.
San Joaquin County has 38 power plants of 1 MW or more with 1.6 GW in all; Stockton Biomass is 3% of that and the largest of 4 biomass plants there.
Its capacity factor of 75% in 2025 is higher than the 25% typical for biomass plants across the US.
The average electricity customer in San Joaquin County goes 4.0 hours a year without power, the 45th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Stockton Biomass (outlined) and other plants in San Joaquin County, shaded. 37.944, -121.330.
Plant facts
- Operator
- DTE Stockton LLC
- Sector
- IPP CHP
- Grid operator
- CISO
- County
- San Joaquin County, CA
- EIA plant ID
- 54238
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| STG | Wood/Wood Waste Biomass | 54 MW | 1987 | – |
Questions
Stockton Biomass, answered
How much power does Stockton Biomass produce?
Stockton Biomass has 54 MW of capacity from one generator. In 2025 it generated 356 GWh, 75% of the most it could have made running flat out all year (its capacity factor).
How many homes does Stockton Biomass power?
Its 2025 output of 356 GWh equals the yearly electricity use of about 60,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Stockton Biomass?
Stockton Biomass is in San Joaquin County, California, at about 37.944°, -121.330°. It is one of 38 power plants of 1 MW or more in the county. The average electricity customer in San Joaquin County goes 4.0 hours a year without power, the 45th most of 56 counties in California. The county's page has the full outage record.
Who operates Stockton Biomass?
It is operated by DTE Stockton LLC (EIA sector: IPP CHP), and it feeds the California ISO.
When did Stockton Biomass open?
Its oldest generator still running came online in 1987.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.