Natural gas power plant · San Joaquin, CA
Lodi
Lodi is a 27 MW natural gas power plant in San Joaquin County, California, operated by Northern California Power Agny. Its oldest generator still running came online in 1986. In 2025 it generated 1.9 GWh, about what 321 average California homes use in a year.
Lodi in context
Among the 304 natural gas plants in California in the EIA's inventory, it is the 171st largest, about 0.1% of the state's 41 GW of natural gas capacity.
San Joaquin County has 38 power plants of 1 MW or more with 1.6 GW in all; Lodi is 2% of that and the 7th largest of 8 natural gas plants there.
Its capacity factor of 1% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in San Joaquin County goes 4.0 hours a year without power, the 45th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Lodi (outlined) and other plants in San Joaquin County, shaded. 38.147, -121.300.
Plant facts
- Operator
- Northern California Power Agny
- Sector
- Electric Utility
- Grid operator
- CISO
- County
- San Joaquin County, CA
- EIA plant ID
- 7451
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 27 MW | 1986 | – |
Questions
Lodi, answered
How much power does Lodi produce?
Lodi has 27 MW of capacity from one generator. In 2025 it generated 1.9 GWh, 1% of the most it could have made running flat out all year (its capacity factor).
How many homes does Lodi power?
Its 2025 output of 1.9 GWh equals the yearly electricity use of about 321 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Lodi?
Lodi is in San Joaquin County, California, at about 38.147°, -121.300°. It is one of 38 power plants of 1 MW or more in the county. The average electricity customer in San Joaquin County goes 4.0 hours a year without power, the 45th most of 56 counties in California. The county's page has the full outage record.
Who operates Lodi?
It is operated by Northern California Power Agny (EIA sector: Electric Utility), and it feeds the California ISO.
When did Lodi open?
Its oldest generator still running came online in 1986.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.