Solar power plant · Kings, CA

Corcoran Solar 3

Corcoran Solar 3 is a 20 MW solar power plant in Kings County, California, operated by RWE Americas, LLC. Its oldest generator still running came online in 2016. In 2025 it generated 48 GWh, about what 8,100 average California homes use in a year.

Capacity20 MWNameplate, September 2026
Generated48 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2016

Corcoran Solar 3 in context

Among the 967 solar plants in California in the EIA's inventory, it is the 214th largest, about 0.1% of the state's 32 GW of solar capacity.

Kings County has 52 power plants of 1 MW or more with 2.8 GW in all; Corcoran Solar 3 is 1% of that and the 17th largest of 41 solar plants there.

Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406020182019202020212022202320242025GWh 48
0204060201920212023202548

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Corcoran Solar 3 (outlined) and other plants in Kings County, shaded. 36.150, -119.585.

Plant facts

Operator
RWE Americas, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Kings County, CA
EIA plant ID
59900
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
C3CA Solar Photovoltaic 20 MW 2016 –

Questions

Corcoran Solar 3, answered

How much power does Corcoran Solar 3 produce?

Corcoran Solar 3 has 20 MW of capacity from one generator. In 2025 it generated 48 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does Corcoran Solar 3 power?

Its 2025 output of 48 GWh equals the yearly electricity use of about 8,100 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Corcoran Solar 3?

Corcoran Solar 3 is in Kings County, California, at about 36.150°, -119.585°. It is one of 52 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.

Who operates Corcoran Solar 3?

It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Corcoran Solar 3 open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.