Solar power plant · Riverside, CA

Maverick Solar 4, LLC

Maverick Solar 4, LLC is a 100 MW solar power plant in Riverside County, California, operated by Maverick Solar 4, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 266 GWh, about what 45,000 average California homes use in a year.

Capacity100 MWNameplate, September 2026
Generated266 GWhIn 2025
Capacity factor30%Share of the most it could make, 2025
Generators1Oldest from 2020

Maverick Solar 4, LLC in context

Among the 967 solar plants in California in the EIA's inventory, it is the 105th largest, about 0.3% of the state's 32 GW of solar capacity.

Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Maverick Solar 4, LLC is 1% of that and the 23rd largest of 70 solar plants there.

Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300400202020212022202320242025GWh 266
0100200300400202020212022202320242025266

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Maverick Solar 4, LLC (outlined) and other plants in Riverside County, shaded. 33.700, -115.380.

Plant facts

Operator
Maverick Solar 4, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Riverside County, CA
EIA plant ID
64104
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MAV02 Solar Photovoltaic 100 MW 2020 –

Questions

Maverick Solar 4, LLC, answered

How much power does Maverick Solar 4, LLC produce?

Maverick Solar 4, LLC has 100 MW of capacity from one generator. In 2025 it generated 266 GWh, 30% of the most it could have made running flat out all year (its capacity factor).

How many homes does Maverick Solar 4, LLC power?

Its 2025 output of 266 GWh equals the yearly electricity use of about 45,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Maverick Solar 4, LLC?

Maverick Solar 4, LLC is in Riverside County, California, at about 33.700°, -115.380°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Who operates Maverick Solar 4, LLC?

It is operated by Maverick Solar 4, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Maverick Solar 4, LLC open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.