Solar power plant · Riverside, CA
Maverick Solar 4, LLC
Maverick Solar 4, LLC is a 100 MW solar power plant in Riverside County, California, operated by Maverick Solar 4, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 266 GWh, about what 45,000 average California homes use in a year.
Maverick Solar 4, LLC in context
Among the 967 solar plants in California in the EIA's inventory, it is the 105th largest, about 0.3% of the state's 32 GW of solar capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Maverick Solar 4, LLC is 1% of that and the 23rd largest of 70 solar plants there.
Its capacity factor of 30% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Maverick Solar 4, LLC (outlined) and other plants in Riverside County, shaded. 33.700, -115.380.
Plant facts
- Operator
- Maverick Solar 4, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 64104
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| MAV02 | Solar Photovoltaic | 100 MW | 2020 | – |
Questions
Maverick Solar 4, LLC, answered
How much power does Maverick Solar 4, LLC produce?
Maverick Solar 4, LLC has 100 MW of capacity from one generator. In 2025 it generated 266 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does Maverick Solar 4, LLC power?
Its 2025 output of 266 GWh equals the yearly electricity use of about 45,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Maverick Solar 4, LLC?
Maverick Solar 4, LLC is in Riverside County, California, at about 33.700°, -115.380°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates Maverick Solar 4, LLC?
It is operated by Maverick Solar 4, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Maverick Solar 4, LLC open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.