Hydro power plant · Plumas, CA
Belden
Belden is a 118 MW hydro power plant in Plumas County, California, operated by Pacific Gas & Electric Co.. Its oldest generator still running came online in 1969. In 2025 it generated 243 GWh, about what 41,000 average California homes use in a year.
Belden in context
Among the 238 hydro plants in California in the EIA's inventory, it is the 28th largest, about 1.2% of the state's 10 GW of hydro capacity.
Plumas County has 11 power plants of 1 MW or more with 611 MW in all; Belden is 19% of that and the 2nd largest of 9 hydro plants there.
Its capacity factor of 24% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Plumas County goes 85 hours a year without power, the 2nd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Belden (outlined) and other plants in Plumas County, shaded. 40.007, -121.249.
Plant facts
- Operator
- Pacific Gas & Electric Co.
- Sector
- Electric Utility
- Grid operator
- CISO
- County
- Plumas County, CA
- EIA plant ID
- 219
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 118 MW | 1969 | – |
Nearby
Other plants in Plumas County
Questions
Belden, answered
How much power does Belden produce?
Belden has 118 MW of capacity from one generator. In 2025 it generated 243 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Belden power?
Its 2025 output of 243 GWh equals the yearly electricity use of about 41,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Belden?
Belden is in Plumas County, California, at about 40.007°, -121.249°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Plumas County goes 85 hours a year without power, the 2nd most of 56 counties in California. The county's page has the full outage record.
Who operates Belden?
It is operated by Pacific Gas & Electric Co. (EIA sector: Electric Utility), and it feeds the California ISO.
When did Belden open?
Its oldest generator still running came online in 1969.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.