Biomass power plant · Plumas, CA
Sierra Pacific Quincy Facility
Sierra Pacific Quincy Facility is a 35 MW biomass power plant in Plumas County, California, operated by Sierra Pacific Industries. Its oldest generator still running came online in 2018. In 2025 it generated 202 GWh, about what 34,000 average California homes use in a year.
Sierra Pacific Quincy Facility in context
Among the 157 other-fuel plants in California in the EIA's inventory, it is the 37th largest, about 0.7% of the state's 4.9 GW of other-fuel capacity.
Plumas County has 11 power plants of 1 MW or more with 611 MW in all; Sierra Pacific Quincy Facility is 6% of that and the largest of 2 biomass plants there.
Its capacity factor of 65% in 2025 is higher than the 25% typical for biomass plants across the US.
The average electricity customer in Plumas County goes 85 hours a year without power, the 2nd most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sierra Pacific Quincy Facility (outlined) and other plants in Plumas County, shaded. 39.941, -120.909.
Plant facts
- Operator
- Sierra Pacific Industries
- Sector
- Industrial Non-CHP
- Grid operator
- CISO
- County
- Plumas County, CA
- EIA plant ID
- 50112
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN3 | Wood/Wood Waste Biomass | 35 MW | 2018 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| GEN1 | Wood/Wood Waste Biomass | 20 MW | 1986 | 2018 |
| GEN2 | Wood/Wood Waste Biomass | 7.5 MW | 1999 | 2018 |
Nearby
Other plants in Plumas County
Questions
Sierra Pacific Quincy Facility, answered
How much power does Sierra Pacific Quincy Facility produce?
Sierra Pacific Quincy Facility has 35 MW of capacity from one generator. In 2025 it generated 202 GWh, 65% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sierra Pacific Quincy Facility power?
Its 2025 output of 202 GWh equals the yearly electricity use of about 34,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sierra Pacific Quincy Facility?
Sierra Pacific Quincy Facility is in Plumas County, California, at about 39.941°, -120.909°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Plumas County goes 85 hours a year without power, the 2nd most of 56 counties in California. The county's page has the full outage record.
Who operates Sierra Pacific Quincy Facility?
It is operated by Sierra Pacific Industries (EIA sector: Industrial Non-CHP), and it feeds the California ISO.
When did Sierra Pacific Quincy Facility open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.