Camino is a 158 MW hydro power plant in El Dorado County, California, operated by Sacramento Municipal Util Dist. Its oldest generator still running came online in 1963. In 2025 it generated 312 GWh, about what 53,000 average California homes use in a year.
Camino in context
Among the 238 hydro plants in California in the EIA's inventory, it is the 17th largest, about 1.5% of the state's 10 GW of hydro capacity.
El Dorado County has 15 power plants of 1 MW or more with 779 MW in all; Camino is 20% of that and the 3rd largest of 10 hydro plants there.
Its capacity factor of 23% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in El Dorado County goes 37 hours a year without power, the 11th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Camino (outlined) and other plants in El Dorado County, shaded. 38.829, -120.537.
Plant facts
- Operator
- Sacramento Municipal Util Dist
- Sector
- Electric Utility
- Grid operator
- BANC
- County
- El Dorado County, CA
- EIA plant ID
- 430
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| H1 | Conventional Hydroelectric | 79 MW | 1963 | – |
| H2 | Conventional Hydroelectric | 79 MW | 1968 | – |
Nearby
Other plants in El Dorado County
Questions
Camino, answered
How much power does Camino produce?
Camino has 158 MW of capacity from 2 generators. In 2025 it generated 312 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Camino power?
Its 2025 output of 312 GWh equals the yearly electricity use of about 53,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Camino?
Camino is in El Dorado County, California, at about 38.829°, -120.537°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in El Dorado County goes 37 hours a year without power, the 11th most of 56 counties in California. The county's page has the full outage record.
Who operates Camino?
It is operated by Sacramento Municipal Util Dist (EIA sector: Electric Utility), and it feeds balancing authority BANC.
When did Camino open?
Its oldest generator still running came online in 1963.