Hydro power plant · El Dorado, CA

Jones Fork

Jones Fork is a 10 MW hydro power plant in El Dorado County, California, operated by Sacramento Municipal Util Dist. Its oldest generator still running came online in 1985. In 2025 it generated 15 GWh, about what 2,500 average California homes use in a year.

Capacity10 MWNameplate, September 2026
Generated15 GWhIn 2025
Capacity factor17%Share of the most it could make, 2025
Generators1Oldest from 1985

Jones Fork in context

Among the 238 hydro plants in California in the EIA's inventory, it is the 117th largest, about 0.1% of the state's 10 GW of hydro capacity.

El Dorado County has 15 power plants of 1 MW or more with 779 MW in all; Jones Fork is 1% of that and the 8th largest of 10 hydro plants there.

Its capacity factor of 17% in 2025 is lower than the 34% typical for hydro plants across the US.

The average electricity customer in El Dorado County goes 37 hours a year without power, the 11th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01020304020182019202020212022202320242025GWh 15
010203040201920212023202515

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Jones Fork (outlined) and other plants in El Dorado County, shaded. 38.850, -120.382.

Plant facts

Operator
Sacramento Municipal Util Dist
Sector
Electric Utility
Grid operator
BANC
County
El Dorado County, CA
EIA plant ID
534
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Conventional Hydroelectric 10 MW 1985 –

Questions

Jones Fork, answered

How much power does Jones Fork produce?

Jones Fork has 10 MW of capacity from one generator. In 2025 it generated 15 GWh, 17% of the most it could have made running flat out all year (its capacity factor).

How many homes does Jones Fork power?

Its 2025 output of 15 GWh equals the yearly electricity use of about 2,500 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Jones Fork?

Jones Fork is in El Dorado County, California, at about 38.850°, -120.382°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in El Dorado County goes 37 hours a year without power, the 11th most of 56 counties in California. The county's page has the full outage record.

Who operates Jones Fork?

It is operated by Sacramento Municipal Util Dist (EIA sector: Electric Utility), and it feeds balancing authority BANC.

When did Jones Fork open?

Its oldest generator still running came online in 1985.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.