Wind power plant · Solano, CA
Shiloh IV Wind Project LLC
Shiloh IV Wind Project LLC is a 103 MW wind power plant in Solano County, California, operated by EDF Renewable Asset Holdings, Inc.. Its oldest generator still running came online in 2012. In 2025 it generated 293 GWh, about what 49,000 average California homes use in a year.
Shiloh IV Wind Project LLC in context
Among the 112 wind plants in California in the EIA's inventory, it is the 25th largest, about 1.6% of the state's 6.6 GW of wind capacity.
Solano County has 35 power plants of 1 MW or more with 1.5 GW in all; Shiloh IV Wind Project LLC is 7% of that and the 6th largest of 12 wind plants there.
Its capacity factor of 33% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Solano County goes 6.7 hours a year without power, the 35th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Shiloh IV Wind Project LLC (outlined) and other plants in Solano County, shaded. 38.137, -121.855.
Plant facts
- Operator
- EDF Renewable Asset Holdings, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Solano County, CA
- EIA plant ID
- 57725
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 103 MW | 2012 | – |
Questions
Shiloh IV Wind Project LLC, answered
How much power does Shiloh IV Wind Project LLC produce?
Shiloh IV Wind Project LLC has 103 MW of capacity from one generator. In 2025 it generated 293 GWh, 33% of the most it could have made running flat out all year (its capacity factor).
How many homes does Shiloh IV Wind Project LLC power?
Its 2025 output of 293 GWh equals the yearly electricity use of about 49,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Shiloh IV Wind Project LLC?
Shiloh IV Wind Project LLC is in Solano County, California, at about 38.137°, -121.855°. It is one of 35 power plants of 1 MW or more in the county. The average electricity customer in Solano County goes 6.7 hours a year without power, the 35th most of 56 counties in California. The county's page has the full outage record.
Who operates Shiloh IV Wind Project LLC?
It is operated by EDF Renewable Asset Holdings, Inc. (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Shiloh IV Wind Project LLC open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.