Wind power plant · Solano, CA
Montezuma Wind II
Montezuma Wind II is a 78 MW wind power plant in Solano County, California, operated by NextEra Energy Montezuma Wind II, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 196 GWh, about what 33,000 average California homes use in a year.
Montezuma Wind II in context
Among the 112 wind plants in California in the EIA's inventory, it is the 36th largest, about 1.2% of the state's 6.6 GW of wind capacity.
Solano County has 35 power plants of 1 MW or more with 1.5 GW in all; Montezuma Wind II is 5% of that and the 7th largest of 12 wind plants there.
Its capacity factor of 29% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Solano County goes 6.7 hours a year without power, the 35th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Montezuma Wind II (outlined) and other plants in Solano County, shaded. 38.117, -121.822.
Plant facts
- Operator
- NextEra Energy Montezuma Wind II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Solano County, CA
- EIA plant ID
- 57701
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 78 MW | 2012 | – |
Nearby
Other plants in Solano County
Questions
Montezuma Wind II, answered
How much power does Montezuma Wind II produce?
Montezuma Wind II has 78 MW of capacity from one generator. In 2025 it generated 196 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Montezuma Wind II power?
Its 2025 output of 196 GWh equals the yearly electricity use of about 33,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Montezuma Wind II?
Montezuma Wind II is in Solano County, California, at about 38.117°, -121.822°. It is one of 35 power plants of 1 MW or more in the county. The average electricity customer in Solano County goes 6.7 hours a year without power, the 35th most of 56 counties in California. The county's page has the full outage record.
Who operates Montezuma Wind II?
It is operated by NextEra Energy Montezuma Wind II, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Montezuma Wind II open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.