A G Wishon is a 13 MW hydro power plant in Madera County, California, operated by Pacific Gas & Electric Co.. Its oldest generator still running came online in 1910. In 2025 it generated 16 GWh, about what 2,700 average California homes use in a year.
A G Wishon in context
Among the 238 hydro plants in California in the EIA's inventory, it is the 99th largest, about 0.1% of the state's 10 GW of hydro capacity.
Madera County has 24 power plants of 1 MW or more with 496 MW in all; A G Wishon is 3% of that and the 3rd largest of 6 hydro plants there.
Its capacity factor of 14% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Madera County goes 11 hours a year without power, the 25th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
A G Wishon (outlined) and other plants in Madera County, shaded. 37.151, -119.505.
Plant facts
- Operator
- Pacific Gas & Electric Co.
- Sector
- Electric Utility
- Grid operator
- CISO
- County
- Madera County, CA
- EIA plant ID
- 293
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 3.2 MW | 1910 | – |
| 2 | Conventional Hydroelectric | 3.2 MW | 1910 | – |
| 3 | Conventional Hydroelectric | 3.2 MW | 1910 | – |
| 4 | Conventional Hydroelectric | 3.2 MW | 1910 | – |
Nearby
Other plants in Madera County
Questions
A G Wishon, answered
How much power does A G Wishon produce?
A G Wishon has 13 MW of capacity from 4 generators. In 2025 it generated 16 GWh, 14% of the most it could have made running flat out all year (its capacity factor).
How many homes does A G Wishon power?
Its 2025 output of 16 GWh equals the yearly electricity use of about 2,700 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is A G Wishon?
A G Wishon is in Madera County, California, at about 37.151°, -119.505°. It is one of 24 power plants of 1 MW or more in the county. The average electricity customer in Madera County goes 11 hours a year without power, the 25th most of 56 counties in California. The county's page has the full outage record.
Who operates A G Wishon?
It is operated by Pacific Gas & Electric Co. (EIA sector: Electric Utility), and it feeds the California ISO.
When did A G Wishon open?
Its oldest generator still running came online in 1910.