Solar power plant · Madera, CA
KDC Solar Madera LLC
KDC Solar Madera LLC is a 10 MW solar power plant in Madera County, California, operated by TRITEC Americas. Its oldest generator still running came online in 2023.
KDC Solar Madera LLC in context
Among the 967 solar plants in California in the EIA's inventory, it is the 296th largest, about 0.0% of the state's 32 GW of solar capacity.
Madera County has 24 power plants of 1 MW or more with 496 MW in all; KDC Solar Madera LLC is 2% of that and the 3rd largest of 15 solar plants there.
The average electricity customer in Madera County goes 11 hours a year without power, the 25th most of 56 counties in California. The county's page has the full outage record.
Where it is
KDC Solar Madera LLC (outlined) and other plants in Madera County, shaded. 36.926, -120.104.
Plant facts
- Operator
- TRITEC Americas
- Sector
- IPP Non-CHP
- Grid operator
- BANC
- County
- Madera County, CA
- EIA plant ID
- 68038
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| VSPRC | Solar Photovoltaic | 10 MW | 2023 | – |
Nearby
Other plants in Madera County
Questions
KDC Solar Madera LLC, answered
How much power does KDC Solar Madera LLC produce?
KDC Solar Madera LLC has 10 MW of capacity from one generator. No full year of generation is reported yet.
Where is KDC Solar Madera LLC?
KDC Solar Madera LLC is in Madera County, California, at about 36.926°, -120.104°. It is one of 24 power plants of 1 MW or more in the county. The average electricity customer in Madera County goes 11 hours a year without power, the 25th most of 56 counties in California. The county's page has the full outage record.
Who operates KDC Solar Madera LLC?
It is operated by TRITEC Americas (EIA sector: IPP Non-CHP), and it feeds balancing authority BANC.
When did KDC Solar Madera LLC open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.