Solar power plant · Madera, CA

Adera Solar

Adera Solar is a 20 MW solar power plant in Madera County, California, operated by AES Distributed Energy. Its oldest generator still running came online in 2015. In 2025 it generated 33 GWh, about what 5,500 average California homes use in a year.

Capacity20 MWNameplate, September 2026
Generated33 GWhIn 2025
Capacity factor19%Share of the most it could make, 2025
Generators1Oldest from 2015

Adera Solar in context

Among the 967 solar plants in California in the EIA's inventory, it is the 219th largest, about 0.1% of the state's 32 GW of solar capacity.

Madera County has 24 power plants of 1 MW or more with 496 MW in all; Adera Solar is 4% of that and the 2nd largest of 15 solar plants there.

Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Madera County goes 11 hours a year without power, the 25th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0102030405020182019202020212022202320242025GWh 33
01020304050201920212023202533

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Adera Solar (outlined) and other plants in Madera County, shaded. 37.121, -120.325.

Plant facts

Operator
AES Distributed Energy
Sector
IPP Non-CHP
Grid operator
CISO
County
Madera County, CA
EIA plant ID
60027
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ADERA Solar Photovoltaic 20 MW 2015 –

Questions

Adera Solar, answered

How much power does Adera Solar produce?

Adera Solar has 20 MW of capacity from one generator. In 2025 it generated 33 GWh, 19% of the most it could have made running flat out all year (its capacity factor).

How many homes does Adera Solar power?

Its 2025 output of 33 GWh equals the yearly electricity use of about 5,500 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Adera Solar?

Adera Solar is in Madera County, California, at about 37.121°, -120.325°. It is one of 24 power plants of 1 MW or more in the county. The average electricity customer in Madera County goes 11 hours a year without power, the 25th most of 56 counties in California. The county's page has the full outage record.

Who operates Adera Solar?

It is operated by AES Distributed Energy (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Adera Solar open?

Its oldest generator still running came online in 2015.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.