Wind power plant · Riverside, CA

Edom Hills Project 1 LLC

Edom Hills Project 1 LLC is a 20 MW wind power plant in Riverside County, California, operated by Edom Hills Project 1 LLC. Its oldest generator still running came online in 2008. In 2025 it generated 1.6 GWh, about what 270 average California homes use in a year.

Capacity20 MWNameplate, September 2026
Generated1.6 GWhIn 2025
Capacity factor1%Share of the most it could make, 2025
Generators1Oldest from 2008

Edom Hills Project 1 LLC in context

Among the 112 wind plants in California in the EIA's inventory, it is the 73rd largest, about 0.3% of the state's 6.6 GW of wind capacity.

Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Edom Hills Project 1 LLC is 0% of that and the 15th largest of 22 wind plants there.

Its capacity factor of 1% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0102030405020182019202020212022202320242025GWh 2
0102030405020192021202320252

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Edom Hills Project 1 LLC (outlined) and other plants in Riverside County, shaded. 33.882, -116.460.

Plant facts

Operator
Edom Hills Project 1 LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Riverside County, CA
EIA plant ID
50553
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 20 MW 2008 –

Retired

GeneratorTechnologyCapacityOnlineRetired
WGNSOnshore Wind Turbine11 MW19852007

Questions

Edom Hills Project 1 LLC, answered

How much power does Edom Hills Project 1 LLC produce?

Edom Hills Project 1 LLC has 20 MW of capacity from one generator. In 2025 it generated 1.6 GWh, 1% of the most it could have made running flat out all year (its capacity factor).

How many homes does Edom Hills Project 1 LLC power?

Its 2025 output of 1.6 GWh equals the yearly electricity use of about 270 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Edom Hills Project 1 LLC?

Edom Hills Project 1 LLC is in Riverside County, California, at about 33.882°, -116.460°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Who operates Edom Hills Project 1 LLC?

It is operated by Edom Hills Project 1 LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Edom Hills Project 1 LLC open?

Its oldest generator still running came online in 2008.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.