Biomass power plant · Colusa, CA
Wadham Energy
Wadham Energy is a 29 MW biomass power plant in Colusa County, California, operated by Wadham Energy LP. Its oldest generator still running came online in 1989. In 2025 it generated 145 GWh, about what 24,000 average California homes use in a year.
Wadham Energy in context
Among the 157 other-fuel plants in California in the EIA's inventory, it is the 45th largest, about 0.6% of the state's 4.9 GW of other-fuel capacity.
Colusa County has 4 power plants of 1 MW or more with 749 MW in all; Wadham Energy is 4% of that and the largest of 2 biomass plants there.
Its capacity factor of 57% in 2025 is higher than the 25% typical for biomass plants across the US.
The average electricity customer in Colusa County goes 10 hours a year without power, the 26th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wadham Energy (outlined) and other plants in Colusa County, shaded. 39.106, -122.110.
Plant facts
- Operator
- Wadham Energy LP
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Colusa County, CA
- EIA plant ID
- 50293
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Other Waste Biomass | 29 MW | 1989 | – |
Nearby
Other plants in Colusa County
Questions
Wadham Energy, answered
How much power does Wadham Energy produce?
Wadham Energy has 29 MW of capacity from one generator. In 2025 it generated 145 GWh, 57% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wadham Energy power?
Its 2025 output of 145 GWh equals the yearly electricity use of about 24,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wadham Energy?
Wadham Energy is in Colusa County, California, at about 39.106°, -122.110°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Colusa County goes 10 hours a year without power, the 26th most of 56 counties in California. The county's page has the full outage record.
Who operates Wadham Energy?
It is operated by Wadham Energy LP (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Wadham Energy open?
Its oldest generator still running came online in 1989.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.