Solar power plant · Kings, CA

CID Solar, LLC

CID Solar, LLC is a 20 MW solar power plant in Kings County, California, operated by Onward Energy. Its oldest generator still running came online in 2014. In 2025 it generated 41 GWh, about what 6,900 average California homes use in a year.

Capacity20 MWNameplate, September 2026
Generated41 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2014

CID Solar, LLC in context

Among the 967 solar plants in California in the EIA's inventory, it is the 188th largest, about 0.1% of the state's 32 GW of solar capacity.

Kings County has 52 power plants of 1 MW or more with 2.8 GW in all; CID Solar, LLC is 1% of that and the 15th largest of 41 solar plants there.

Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406020182019202020212022202320242025GWh 41
0204060201920212023202541

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

CID Solar, LLC (outlined) and other plants in Kings County, shaded. 36.138, -119.565.

Plant facts

Operator
Onward Energy
Sector
IPP Non-CHP
Grid operator
CISO
County
Kings County, CA
EIA plant ID
59183
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 20 MW 2014 –

Questions

CID Solar, LLC, answered

How much power does CID Solar, LLC produce?

CID Solar, LLC has 20 MW of capacity from one generator. In 2025 it generated 41 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does CID Solar, LLC power?

Its 2025 output of 41 GWh equals the yearly electricity use of about 6,900 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is CID Solar, LLC?

CID Solar, LLC is in Kings County, California, at about 36.138°, -119.565°. It is one of 52 power plants of 1 MW or more in the county. The average electricity customer in Kings County goes 2.9 hours a year without power, the 51st most of 56 counties in California. The county's page has the full outage record.

Who operates CID Solar, LLC?

It is operated by Onward Energy (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did CID Solar, LLC open?

Its oldest generator still running came online in 2014.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.