Solar power plant · Riverside, CA
Desert Sunlight 250, LLC
Desert Sunlight 250, LLC is a 250 MW solar power plant in Riverside County, California, operated by NextEra Energy Desert Sunlight 250, LLC. Its oldest generator still running came online in 2013. In 2025 it generated 517 GWh, about what 87,000 average California homes use in a year.
Desert Sunlight 250, LLC in context
Among the 967 solar plants in California in the EIA's inventory, it is the 42nd largest, about 0.8% of the state's 32 GW of solar capacity.
Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Desert Sunlight 250, LLC is 2% of that and the 13th largest of 70 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Desert Sunlight 250, LLC (outlined) and other plants in Riverside County, shaded. 33.806, -115.395.
Plant facts
- Operator
- NextEra Energy Desert Sunlight 250, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CISO
- County
- Riverside County, CA
- EIA plant ID
- 58542
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DSL12 | Solar Photovoltaic | 39 MW | 2013 | – |
| DSL13 | Solar Photovoltaic | 39 MW | 2014 | – |
| DSL17 | Solar Photovoltaic | 29 MW | 2013 | – |
| DSL18 | Solar Photovoltaic | 29 MW | 2014 | – |
| DSL14 | Solar Photovoltaic | 27 MW | 2014 | – |
| DSL20 | Solar Photovoltaic | 25 MW | 2013 | – |
| DSL19 | Solar Photovoltaic | 25 MW | 2014 | – |
| DSL16 | Solar Photovoltaic | 23 MW | 2013 | – |
| DSL15 | Solar Photovoltaic | 14 MW | 2014 | – |
Questions
Desert Sunlight 250, LLC, answered
How much power does Desert Sunlight 250, LLC produce?
Desert Sunlight 250, LLC has 250 MW of capacity from 9 generators. In 2025 it generated 517 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Desert Sunlight 250, LLC power?
Its 2025 output of 517 GWh equals the yearly electricity use of about 87,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Desert Sunlight 250, LLC?
Desert Sunlight 250, LLC is in Riverside County, California, at about 33.806°, -115.395°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.
Who operates Desert Sunlight 250, LLC?
It is operated by NextEra Energy Desert Sunlight 250, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.
When did Desert Sunlight 250, LLC open?
Its oldest generator still running came online in 2013.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.