Solar power plant · Riverside, CA

Desert Sunlight 250, LLC

Desert Sunlight 250, LLC is a 250 MW solar power plant in Riverside County, California, operated by NextEra Energy Desert Sunlight 250, LLC. Its oldest generator still running came online in 2013. In 2025 it generated 517 GWh, about what 87,000 average California homes use in a year.

Capacity250 MWNameplate, September 2026
Generated517 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators9Oldest from 2013

Desert Sunlight 250, LLC in context

Among the 967 solar plants in California in the EIA's inventory, it is the 42nd largest, about 0.8% of the state's 32 GW of solar capacity.

Riverside County has 121 power plants of 1 MW or more with 11 GW in all; Desert Sunlight 250, LLC is 2% of that and the 13th largest of 70 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 517
02004006008002019202120232025517

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Desert Sunlight 250, LLC (outlined) and other plants in Riverside County, shaded. 33.806, -115.395.

Plant facts

Operator
NextEra Energy Desert Sunlight 250, LLC
Sector
IPP Non-CHP
Grid operator
CISO
County
Riverside County, CA
EIA plant ID
58542
Where California's power comes from → California power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
DSL12 Solar Photovoltaic 39 MW 2013 –
DSL13 Solar Photovoltaic 39 MW 2014 –
DSL17 Solar Photovoltaic 29 MW 2013 –
DSL18 Solar Photovoltaic 29 MW 2014 –
DSL14 Solar Photovoltaic 27 MW 2014 –
DSL20 Solar Photovoltaic 25 MW 2013 –
DSL19 Solar Photovoltaic 25 MW 2014 –
DSL16 Solar Photovoltaic 23 MW 2013 –
DSL15 Solar Photovoltaic 14 MW 2014 –

Questions

Desert Sunlight 250, LLC, answered

How much power does Desert Sunlight 250, LLC produce?

Desert Sunlight 250, LLC has 250 MW of capacity from 9 generators. In 2025 it generated 517 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does Desert Sunlight 250, LLC power?

Its 2025 output of 517 GWh equals the yearly electricity use of about 87,000 average California homes (494 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Desert Sunlight 250, LLC?

Desert Sunlight 250, LLC is in Riverside County, California, at about 33.806°, -115.395°. It is one of 121 power plants of 1 MW or more in the county. The average electricity customer in Riverside County goes 5.0 hours a year without power, the 37th most of 56 counties in California. The county's page has the full outage record.

Who operates Desert Sunlight 250, LLC?

It is operated by NextEra Energy Desert Sunlight 250, LLC (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did Desert Sunlight 250, LLC open?

Its oldest generator still running came online in 2013.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average California home's 494 kWh a month in 2025. Methodology.